CommonProduct MarketingOne project at a timeand you choose the directionWhat travelsWhat it refuses to doField mapping without typing an idGetting started

Two-Way OpenProject Sync | Timebars Ltd.

If your organisation already runs OpenProject, you have work packages, a type

If your organisation already runs OpenProject, you have work packages, a type hierarchy and a team that knows where things live. What you almost certainly do not have is a resource view that shows who is overloaded before the month starts, or a portfolio score that decides which project should start next.

That is the gap this sync closes. It moves a project and everything beneath it between OpenProject and the Timebars suite, in whichever direction you choose, one project at a time — so you can bring a plan into Timebars, resource it properly, and push the result back without anybody re-keying anything.

One project at a time, and you choose the direction

Every project carries a sync master: the side that owns it. The create steps set it; the update steps refuse to run against a project owned by the other side and tell you which button to press instead. Changing master is a deliberate edit on the project, never something a run does behind your back.

That gives four straightforward scenarios:

Timebars owns it OpenProject owns it
Create Create the project and every row beneath it in OpenProject Create the project and every bar beneath it in Timebars
Update Update OpenProject, creating anything missing Update Timebars, creating anything missing

There is no separate bulk-create step. The update runs create whatever is missing as they go, so a project that has grown since the last run does not need a different button.

What travels

OpenProject calls everything beneath a project a work package. The suite does not — it has levels, and the level decides where a row goes.

In Timebars Becomes, in OpenProject
Project an OpenProject project
Sub-Project a work package of type L3 SP/WP
Task L4 Task
Task with subtype Risk, Issue or Change Request L4 Risk, L4 Issue, L4 CR
Milestone L4 Milestone
Allocation L5 Allocation, carrying the assignee

Custom fields travel with them. Over 150 fields are mapped as shipped, and the mapping is yours to change — see Your configuration is data, not code.

One honest limitation: Portfolio rows do not travel. OpenProject has no equivalent type, so a run always starts at a project and covers everything underneath it.

What it refuses to do

Most of the engineering in a two-way sync is not in moving data. It is in refusing to move data when moving it would lose something.

  • Every run previews before it writes, and asks once.
  • A row deleted on one side is reported, never deleted on the other. Removals stay a human decision, always.
  • Every row it could not carry is named, with the reason — printed where you are already looking, and downloadable as a CSV. A run whose only entries are notes is a clean run.
  • Conflicts are detected against OpenProject's own clock, so the comparison is exact rather than a guess about whose copy is newer. A conflicted row is logged and the master side wins.
  • An update against a project owned by the other side simply will not run. It names the button you wanted instead.

Field mapping without typing an id

OpenProject numbers its custom fields per instance — your customField107 is not another customer's. So the suite never asks you to type one.

Discover walks the project, work package and user schemas and writes nothing at all, so it is safe to run whenever you like. Reconcile then matches every field and every picklist value by name and records the ids it finds. It previews, asks, and changes only your local database — it never writes to OpenProject, because OpenProject's API cannot create a custom field or a picklist value anyway. What it does instead is tell you exactly which ones are missing and hand you the list to paste into its admin screens.

Reconcile also never decides whether a field travels. That switch is yours, held in your workbook, because it is a configuration decision that has to survive the next import.

Getting started

  1. Point the suite at your instance and run Test Connection. It reads your identity and the instance's type list, and prints the work package type ids you actually have. Almost every "nothing happened" report starts here.
  2. Run Discover, then Reconcile. Fix anything Reconcile reports missing in OpenProject's admin screens, then reconcile again.
  3. Pick one project, choose a direction, and run the create step. Read the feedback list before assuming it worked.

Types are matched by name at run time, never by id, so a type renamed in OpenProject admin stops resolving until the name matches again. That is deliberate: names are stable across instances, ids are not.

Published: September 23, 2026